RCM risk levels
Description
Print the RCM Risk Levels report for equipment. The RCM (Reliability Centered Maintenance) Risk Levels report shows the output of a RCM risk assessment or risk analysis. The report includes risk matrix set-up records where Type is Risk Level.
You can sort the report by Risk Level or Risk Priority Number.
Menu Path
Parameters
Specify the Organization, Equipment, RCM Project, Minimum Risk Level, and the RCM Level.
- Include Children
- Select this check box to include the children of the selected equipment in the report.
- Include Functions
- Select this check box to include the list of functional failures for the selected equipment.
- Include Failure Modes
- Select this check box to include the list of failure modes for the selected equipment.
- Risk Assessment
- Select this check box to show all records that have a risk level of risk assessment.
- Risk Analysis
- Select this check box to show all records that have a risk level of risk analysis.
Report Type
Basic