Defining PM Schedules for equipment configurations

Define PM Schedule details to attach to equipment generated based on the equipment configuration. The equipment configuration header record system status must be Unfinished to define PM Schedules for equipment configurations.

To define PM schedules for equipment configurations:

  1. Select Equipment > Equipment Configuration Equipment Configuration.
  2. Select the equipment for which to define PM schedules for equipment configurations, and then click the PM Schedules tab.
  3. Click Add PM.
  4. Specify the PM Schedule, PM Type, WO Class, Dormant Start, Dormant End, and Test Point Set.
  5. Specify this information:
    Perform Every
    Specify the length of time to elapse before the system releases the PM work order, and then select the unit of measure for the PM period in the adjacent field.
    Meter Interval
    Specify the length of the interval and the unit of measure for the first meter that prompts the release of the PM work order on usage of the equipment.
    Meter #2 Interval
    Specify the length of the interval and the unit of measure for the second meter that prompts the release of the PM work order on usage of the equipment.
    Perform On
    Specify the week of the month on which to perform the work on the equipment.
    Perform On Day
    Specify the day of the week on which to perform the work on the equipment.
  6. Select the Use PM Schedule Setup check box to use the PM Schedule setup.
  7. Select the Reuse Dormant Period check box to use the same specified dormant period for the PM on a yearly basis. If you select Reuse Dormant Period, the system automatically updates the specified Dormant Start and Dormant End dates after the dormant period has elapsed.
  8. Click Submit.